Laundry room
A finished laundry room, delivered and set in your yard. Wired and finished inside, with the plumbing ready to hook up.
IllustrationFor a house with no laundry room, a rental, a shop, or land you are living on while you build.
One washer and dryer, a sink and a counter.
| 8x10, with washer and dryer | Text us for the price |
|---|---|
| 8x10, without washer and dryer | Text us for the price |
Need two washers and two dryers for a rental or an RV park? Text us about a 10x16.
Siding, trim and roof colours are picked with your quote.
The floor plan

What is included
The building
- The 8x10 gambrel building, with LP siding and a copper-colour metal roof
- 8 ft walls
- A solid 80 in. prehung door that swings out
- A floor framed 12 in. on centre, with a plywood floor
- A 3x3 vinyl window over the counter
Finished inside
- The finished package: 8 outlets, 8 can lights, 3 switches, a breaker box, and a 50 amp 240 volt inlet with a 25 ft cord
- Open shelving
Laundry
- A 24 in. stainless sink cabinet, with the plumbing ready for the sink, washer and dryer
- A 30 amp 240 volt dryer circuit
- A 4 in. dryer vent through the back wall
- A 4 gallon mini water heater in the sink cabinet
- A 6 ft butcher block counter, wall-hung
- A 20 amp outlet for a plug-in heater (the heater is not included)
Not included
Ground anchors. Permits. Bringing water, a drain and power to the building.
What your site needs
- Power
- The building plugs in with a 50 amp, 240 volt RV-style inlet. A 25 ft cord is included.
- Water
- A water line to the building. The plumbing inside is in place.
- Drain
- A drain connection. That hookup is done on your side.
- Level ground
- We set the building level on treated wood and concrete blocks, up to 12 inches. More than that costs extra.
- A way in
- The building is moved into place with a remote-control mule. Not sure about your gate or driveway? Text us a photo.
- Permits
- Permits, setbacks and HOA rules are yours to check with your county. Genesis does not pull them. A building with plumbing usually needs a foundation to get a county permit.
Build time
Finished buildings take 8 to 12 weeks, not counting permits. We confirm the build time with your quote. Delivery and set come after the build.
Paying
Half down starts the build. The other half is due at completion, before delivery.